The City is maintaining existing sidewalks and addressing selected sidewalk gaps at multiple locations across Douglasville. The work includes sidewalk repairs, alley repairs and planned sidewalk connections identified in the project source material.
The project supports pedestrian access and helps preserve sidewalk infrastructure in areas identified for repair or connection work.
The source material lists a $400,000 project budget for the overall sidewalk maintenance and gap improvements project. Funding is identified as Special Purpose Local Option Sales Tax (SPLOST) 2022 transportation funding.
No temporary public impacts have been identified in the source material.
The source material identifies the Americans with Disabilities Act (ADA) Transition Plan and Bike/Pedestrian Plan as related plans for several listed sidewalk locations.