Weather permitting, Georgia Department of Transportation (Georgia DOT) and its contractors will implement daytime traffic pacing near the I-285/I-20 west interchange to perform controlled blasting of rock. Additionally, contractors will temporarily close interstate lanes nightly for geotechnical borings, utility location, and setting barrier walls in preparation for upcoming construction.
PDF forms must be downloaded, completed, and submitted via email or in person as directed.
Download Form(PDF, 113KB)
Contact the Building Division at 678-449-3230 for assistance with any applications or forms.
Comm-Architectural-Review-Checklist.pdf(PDF, 209KB)
Residential-Plan-Review-Checklist.pdf(PDF, 206KB)
Commercial-Alteration_Remodel-SCL.pdf(PDF, 301KB)
Commercial-New-or-Addition-SCL.pdf(PDF, 272KB)
Electrical-SCL.pdf(PDF, 248KB)
General-Review-Process.pdf(PDF, 158KB)
Mechanical-SCL.pdf(PDF, 248KB)
Plumbing-SCL.pdf(PDF, 252KB)
Residential-Alteration_Remodel-SCL.pdf(PDF, 254KB)
Residential-New-or-Addition-SCL.pdf(PDF, 258KB)
Residential-Pool-SCL.pdf(PDF, 194KB)